Engineering-led IT in real client environments
A selection of managed IT, cybersecurity, network, infrastructure and automation work delivered for Australian clients. Some clients appear in more than one area because the work spans multiple parts of their environment.
Hybrid Azure, built around how the business works
VMware exit → Azure Local, 20+ workloads
110+ sites onto SD-WAN in under 60 days, with no branch outages
110+ sites · <60 daysBrowse by service
Grouped by service area, so you can go straight to the work that matches your environment.
VLI's managed IT model brought support, infrastructure and continuity into one operating rhythm
Managed IT now keeps users, Microsoft 365, infrastructure, backup and escalation inside a practical, consistent operating rhythm.
Read case study →VLI Conveyors moved from on-prem Exchange to a more secure and supportable Microsoft 365 operating environment
Email, identity, endpoint management through Intune and a stronger security baseline were brought into one consistent operating model, ready for managed services.
Read case study →Beijer strengthened its internal IT team with a defined co-managed operating model
A defined co-managed operating model added senior engineering depth across infrastructure, network, security and project delivery, without displacing the internal team.
Read case study →Turner Engineering was integrated into the Beijer Ref operating environment without disrupting day-to-day operations
Users, identity, Microsoft 365 and systems access were aligned to the group model so the integrated business could operate as one.
Read case study →Southpac Constructions moved its head office. The IT experience on day one was calm, ready and operational.
Network, endpoints, AV and telephony were planned and staged ahead of cutover, and day-one operations ran without disruption to the business.
Read case study →Managed IT for JQZ: engineering-led, cyber-first operations for property development cadence
One managed rhythm across Microsoft 365, identity, endpoints, backup and security.
Read case study →Managed IT for PPK Mining Equipment, where office systems, infrastructure and daily operations are connected
Reactive support replaced by engineering escalation and clearer ownership.
Read case study →Office and warehouse relocation IT for Turner Engineering. Operational from day one.
Operations resumed in the new facility without a lost morning.
Read case study →Backup and recovery for VLI Conveyors: protecting the business data behind industrial operations
Backup and recovery oversight was rebuilt as an operating discipline, improving resilience and giving the business measurable recovery planning.
Read case study →OYA Financial Services strengthened BEC controls across email, identity and payment-risk workflows
Microsoft 365 security, email authentication, identity controls and payment-process safeguards now operate as a connected defensive layer, not isolated tools.
Read case study →JQZ extended managed IT into managed cyber security across identity, Microsoft 365 and endpoints
Endpoint visibility, Microsoft 365 security, identity monitoring and incident response now operate as a managed layer over day-to-day IT.
Read case study →JQZ protected Microsoft 365 data with independent backup across its environment
A more defensible recovery posture beyond native retention.
Read case study →Backup and resilience for PPK Mining Equipment: protecting the operational systems behind an industrial business
Backup treated as an operating discipline, not a once-configured control.
Read case study →PPK Mining Equipment extended its cyber-maturity programme into a managed cyber security operating discipline
A more disciplined security operating layer above the managed IT baseline.
Read case study →A hybrid Azure environment built around 150 users working from the office, remotely and across construction sites
A hybrid Azure environment was built around Microsoft 365, Entra ID, SharePoint and AVD, with on-premises workloads retained where they made operational sense.
Read case study →Infrastructure modernisation for PPK Mining Equipment: keeping an industrial technology environment supportable before ageing systems become operational risk
Infrastructure was modernised on a planned cycle, keeping the Newcastle industrial technology environment stable and ready for the next operating phase.
Read case study →PPK exited VMware and moved to Azure Local after Broadcom renewal pressure changed the platform decision
Six landing paths were assessed, Azure Local selected, 20+ workloads migrated, and backup and managed support realigned to the new platform.
Read case study →Kirby completed a controlled Sydney data centre migration with Inlight IT
A more supportable hosting foundation.
Read case study →A multi-site healthcare group modernised critical VMware workloads on a resilient Nutanix private cloud
A more resilient, manageable and supportable platform.
Read case study →OYA modernised its technology foundation with a controlled cloud migration
A more supportable cloud operating model.
Read case study →Azure for PPK Mining Equipment: cloud used where it improves resilience, access and supportability
A deliberate hybrid cloud posture under one managed model.
Read case study →Questas built three custom applications where off-the-shelf software did not fit
Three custom open-source applications were built for long-term ownership, removing vendor lock-in while matching the way Questas actually runs production.
Read case study →Beijer Ref returned to Inlight IT for a series of Power Apps that kept proving their value
Multiple workflow domains moved out of email and spreadsheet handling.
Read case study →HBT Waratah Engineering improved time management and job control with custom open-source application development
Purpose-built, supportable operational software.
Read case study →No case studies in this service area yet — talk to us about your environment instead.
What sits behind the work
These projects sit on the same operating model: engineering-led delivery, security built into operations, clear ownership and an escalation path that stays with us.
Explore the services we provide
Open the service area that matches the work you need.
End-to-end IT operations, engineered rather than improvised.
VLI · Beijer Ref · Turner Engineering · JQZExplore Managed IT →Controls, evidence and recovery that hold up under scrutiny.
Essential Eight evidence · BEC controls · backup and recoveryExplore Cybersecurity →The right workloads in the right place, run properly after.
VMware exit to Azure Local · 20+ workloads · hybrid AzureExplore Infrastructure & Cloud →Secure, visible, well-run networks for distributed teams.
110+ sites onto SD-WAN in under 60 days · no branch outagesExplore Networks & SD-WAN →Practical automation first. AI where it has a clear role.
Three custom applications built for long-term ownershipExplore AI & Automation →Specify, source and deploy the right technology.
Platform, provider and architecture decisions, pressure-testedExplore Technology Procurement →Discuss a similar project
If you’re facing a similar project or operational issue, tell us what is changing and we can help define the next step.
Prefer email? contact@inlightit.com.au